Construction of a new 42,000 tonne grain terminal in Stettler, than is located on the CP Rail line. A railway loop track will be built that can accommodate a 150-car unit train. Construction was completed in 2020.
Loading...
Municipality: |
Stettler |
Sector: |
Industrial
|
Type: |
Agriculture
|
Schedule: |
2019 - 2020
|
Estimated Cost: |
$52.8M |
Stage: |
Completed
Projects are proposed from the time they are announced
to the start of construction. For substage fields, see our
methodologies page.
|
Developer: |
G3 Canada Limited
|
Related Links: |
Mar 27, 2019 - Newswire
|