The project involves the construction of the 97.2Mw Whitla Wind Power Project (Phase 2).Construction began in May 2021. A 15-year renewable power purchase agreement has been secured with Dow Chemical Canada ULC, a subsidiary of Dow for 25 megawatts in September 2021.
The project involves the construction of the 97.2Mw Whitla Wind Power Project (Phase 2).
Construction began in May 2021. A 15-year renewable power purchase agreement has been secured with Dow Chemical Canada ULC, a subsidiary of Dow for 25 megawatts in September 2021.