The project will construct a new fertilizer terminal with a storage capacity of 34,400 metric tonnes, along with a looptrack that can accommodate up to 110 car unit trains. The facility will be able to fill a super B trailer in 6 minutes. The facility will support 150 construction jobs, and 5-7 operational jobs upon completion in summer 2020.