Construction of a natural gas pipeline from the Tidewater Brazeau River facility to the Keephills and Sundance Generating Stations. The pipeline will provide an initial capacity of 130 MMcf/d by 2020, and have expansion capability to 340 MMcf/d, which represents approximately 50% of TransAlta’s gas requirements at full capacity. The pipeline will be 120 kilometres long.