The Valley Line West LRT in Edmonton will to have 16 stops (14 street level, 2 elevated) over its 14-kilometer length between Downtown and Lewis Farms. Procurement began in 2020, with construction formally beginning on May 27, 2022. The Government of Alberta has provided $1.04B for the project.
The Valley Line West LRT in Edmonton will to have 16 stops (14 street level, 2 elevated) over its 14-kilometer length between Downtown and Lewis Farms.
Procurement began in 2020, with construction formally beginning on May 27, 2022. The Government of Alberta has provided $1.04B for the project.