Phase H of the project had been deferred due to low oil prices in March 2020. Phase H will eventually add 40,000 barrels per day of capacity. There are seven phases (Phases A - G) currently producing at Foster Creek. Cenovus expects Foster Creek will have a capacity of 390,000 bbs/d upon full build-out. The cost estimate below is for Phase G ($1.35B) & H ($650M). The entire Foster Creek cost estimate for all phases has not been released.
Phase H of the project had been deferred due to low oil prices in March 2020. Phase H will eventually add 40,000 barrels per day of capacity.
There are seven phases (Phases A - G) currently producing at Foster Creek. Cenovus expects Foster Creek will have a capacity of 390,000 bbs/d upon full build-out. The cost estimate below is for Phase G ($1.35B) & H ($650M). The entire Foster Creek cost estimate for all phases has not been released.