North Interceptor Sewer project is meant to add capacity to the city's sanitary sewer system to support growth in South Riel, the area west of Ray Gibbon Drive, lands north of McKenney Avenue and in downtown St. Albert. North Interceptor Sewer is a trunk sewer consisting of a 1500mm ID tunnel approximately 3000m in length which is to be installed by microtunneling.