The facility is anticipated to produce 160 million litres of denatured ethanol for fuel blending, 1.76 mmBtu of biogas, and 12 MWh of green power generation annually. Up to 800 construction jobs are supported by the project, which could be completed as early as 2024.The location on the map is not exact.
The facility is anticipated to produce 160 million litres of denatured ethanol for fuel blending, 1.76 mmBtu of biogas, and 12 MWh of green power generation annually. Up to 800 construction jobs are supported by the project, which could be completed as early as 2024.