Synapse Data Center Inc has announced plans for a proposed one-gigawatt (1 GW), 2 million square foot data centre development in Olds, Alberta capable of supporting Fortune 10–level GPU requirements. The project represents a $10 billion private-sector investment over an estimated two-year construction period. The project is expected to include the creation of 2,000 construction jobs during development, more than 1,000 long-term high-skilled technology and operations jobs once fully operational.
The location on the map is a placeholder and not precise.
Loading...