Construction of a 20 Mw solar power project located 4.1 km northeast of Tilley and south of the Tilley A reservoir on Eastern Irrigation District Land.The project was approved by the Alberta Utilities Commission in mid-2022.
Construction of a 20 Mw solar power project located 4.1 km northeast of Tilley and south of the Tilley A reservoir on Eastern Irrigation District Land.
The project was approved by the Alberta Utilities Commission in mid-2022.