Construction of 44 wind turbines that will have an output of approximately 200 MW. The proposed Maleb phase is the second phase of the Forty Mile Wind Power Project. AESO is reporting the project was canceled in 2022.
Construction of 44 wind turbines that will have an output of approximately 200 MW. The proposed Maleb phase is the second phase of the Forty Mile Wind Power Project.
AESO is reporting the project was canceled in 2022.