The 575 km pipeline will collect condensate and other petroleum liquids produced with natural gas in the Montney and Duvernay regions and bring it to the liquids processing and storage hub at Fort Saskatchewan. The pipeline will consist of a 16-inch pipeline for condensate and a 12-inch pipeline for NGL mix and handle 350,000 barrels per day.