Luna 2 Solar+ is the second phase of the Luna Solar+ complex located in Newell County, Alberta, west of Brooks. Developed by Northland Power Luna II GP Inc. (subsidiary of Northland Power), this second phase consists of a 465 MW solar power project paired with an 80 MW/160 MWh battery energy storage system (BESS).
Location on map is not exact.
Loading...