The project will construct an 8-inch, 75-kilometre crude oil pipeline from Inter Pipeline’s Throne Station, connected to the Bow River pipeline system near Coronation to another pipeline system near Stettler. Volume forecasts for the pipeline are estimated at 10,000-15,000 bbls/day. The project will also upgrade the Throne Station, and reconfigure the tank storage space.