The Materials Recovery Facility enhancements include the addition of a ventilation system to the Tip Floor, the installation of 3 new dry scrubbers, concrete slab on grade, housekeeping pad, civil works, associated ducting and supports, patching of existing building envelope and roof, electrical work and instrumentation/ controls. The work includes partial removal of existing ductwork on the Tip Floor roof as well as removal of an existing concrete apron slab and bollards. The City of Edmonton issued a permit for the project on April 17, 2020.