Construction of a new dike southwest of High River. The dike will provide flood protection up to the same water level of the 2013 floods, plus one additional meter of protection. Alignment will run along 12th Avenue SW, and will turn south along 88 Street. Alignment was approved on October 10, 2017. Town of High River will now proceed with purchasing land for the project. Funding for the project is from a $20.9M grant provided by the Government of Alberta.