The proposed power development would consist of a 300 megawatts solar facility known as Jurassic Solar, with an added battery storage system to feed the Alberta grid. The project is located 12 kilometers southwest of Jenner, Alberta.
The proposed power development would consist of a 300 megawatts solar facility known as Jurassic Solar, with an added battery storage system to feed the Alberta grid.
The project is located 12 kilometers southwest of Jenner, Alberta.